10 Questions You Should to Know about Custom Prefab Buildings
10 Questions To Ask Yourself Before Building a Custom Prefab Home
20 Questions Before You Build Your Modular Building
Along with the hard costs of the expansion, the existing facilities may require an additional investment on your part to meet code compliance. Any expansion of an existing structure, should consider potential costs associated with:
For more information, please visit TIANYING.
- New sprinkler systems, fire separation walls, and/or upgrades for ADA compliance (handicap accessibility).
- Additional parking to accommodate the growth
- Upgrades to building facades or landscaping to meet updated zoning ordinances.
- Depending upon the age of the building, potential remediation of hazardous materials such as asbestos or lead'based paints.
Expansion of facilities through the use of permanent modular construction (PMC) or using relocatable modular buildings (RB) is, in most cases, more efficient, less costly, and faster while creating fewer site disruptions.
Depending upon the type and size of the proposed building, the type of construction you choose will determine the building timeline. Conventional construction utilizing an outside architectural firm is usually the lengthiest method. Design'Build utilizing a company with integrated design and costing functions can save you between 10 ' 25% during the design and costing phase. The use of modular construction techniques can usually save 25 ' 40% in time compared to conventional stick'built construction. In fact, in some cases the time required to select a design team, design the project, go through the bidding process, then select the contractor and obtain the permits will take longer than the actual construction itself. Selecting a firm which offers all or most of these services can substantially shorten your timeline. Use this checklist as a reference when interviewing potential builders.
- Selection of an architect or design'build firm
- Pre'planning that includes discussion with the city for zoning, parking, fire lanes, utilities, building setbacks, approved exterior cladding materials, landscaping, etc.
- Building designs
- Civil site designs
- Selection of a contractor if a Design'Build firm is not selected
- Permitting time required for the City and in some cases State and Local Agencies
An architect, space designer, or design-build firm are best qualified to determine the amount of space required. For general office use, hallway space may be minimized through the use of modular furniture and open concept planning. For small office facilities, 200 square feet per person is usually adequate. For educational occupancies, you'll want to refer to your state's education authority for minimum classroom sizes. Beyond the prescribed size of the classroom, generally 25% of additional area should be allocated for ancillary areas such as restrooms, hallways, etc. Since there is no rule of thumb covering every use, consideration should be given to:
- Expecting that the new spaces will require additional toilet rooms and possibly an additional janitor's closet, all needing to meet the latest ADA requirements.
- Allocating space for adequate egress, hallways, storage areas, I.T. closets, conference rooms, and special use rooms.
Ramtech has an extensive catalog of standard floor plans covering education facilities, general office space, and healthcare applications. While these floor plans might not meet your needs exactly, they're generally a good starting point to help in designing your building layout.
Once a design firm or design-builder is selected they can provide a Design-Build Institute of America or AIA contract, or the owner can hire a construction attorney to draw up a contract. Both types of contracts protect the interests of the owner as well as the architect, contractor or design-build firm. For design-build construction, Ramtech utilizes a two-step approach where a stipulated sum is agreed upon for pre-construction services which is normally less than 5% of the anticipated project cost. The pre-construction services include surveys, geotechnical investigations, the design work suitable for qualified pricing of the project, a stipulated sum for the actual construction work, and a critical path project schedule that defines all the work elements and outlines the project's duration. This allows the owner to know exactly what the project's final costs are before a shovel hits the dirt. Ramtech's approach to design-build takes the guesswork out of the equation and offers the owner a safe, risk-free way to execute a design-build project.
The most common problem involves an owner's significant investment in a design, then they find out it is not within their established budget. This primarily occurs with the design-bid-build approach to construction. Under this scenario, true costs can only be determined after competing contractors bid on the project. Unfortunately, this is well after a commitment for design costs has been made. More times than not, problems during the actual construction are site related rather than building related. Virtually every site offers unique challenges that only become apparent after geotechnical and civil surveys have been conducted. To totally vet out a site, the following will be needed:
- Performing a geotechnical investigation consisting of soil borings. From that, a lab analysis will be conducted resulting in a soils report that defines the soils' structure and characteristics at various depths with an engineer's recommendation for the type of foundation that can be used.
- A topographical plan showing the elevations across the site that will be used to develop the grading plans.
- A plot plan showing the property lines, building locations, parking requirements, and related site construction elements.
There are two primary options to consider:
- Lease the space off-site.
- Lease a modular building to be placed on-site.
As stated previously, leasing options are usually available from one to five years or even longer. Operating lease rates for modular buildings are determined by the cost of the building and to what degree it's customized to meet the owner's needs. The more standard a building is, the lower the monthly lease rate will be. This is driven by how likely it will be to re-lease the building as originally configured. In short-term leases, the owner should expect to pay for the building's installation and removal costs. For longer lease periods, these costs may be capitalized into the lease rate. For leases of three to five years, greater flexibility may be available for all sizes and different uses of custom modular buildings.
For more information, please visit Custom Prefab Buildings.
No form of construction is best or least expensive all the time. For comparison, you should consider the design, building construction, site construction, and opportunity costs. If time is not critical, then only the interim construction cost might be considered. If revenue or profits would be maximized by a reduced construction time, that should be considered in determining the construction method. For modular construction where the majority of the building fabrication is performed in a manufacturing plant, it is typically less expensive:
- For remote or rural areas where site contractors are not as prevalent.
- Than in high labor cost areas like military bases or where there is heavy unionization.
- Where less site work may be necessary versus that required for traditional onsite construction.
Although temporary or relocatable modular buildings are usually less expensive than permanent modular construction, PMC will provide you with a greater number of choices on building finishes and layouts.
While there is always a chance for change orders or additional costs, through proper project planning these costs can be minimized. In general, the most common change orders deal with hidden conditions or differing sub-surface conditions. These changes usually affect the foundation design. This change order can be virtually eliminated by obtaining a geotechnical investigation consisting of soil borings, lab analysis, and a soils report that clearly defines the soil structure and its characteristics at various depths. This will then be taken into consideration for the foundation design along with other subsurface conditions that can affect the contract amount including:
- Shallow rock formations which could affect the utility installation.
- Unexpected subsurface contamination (buried fuel tanks, etc.) that must be removed and cleaned up.
- Shallow subsurface water levels which may require the foundation piers to be cased.
Be prepared to spend the time required early on to analyze and make decisions when presented with these challenges. Changes to designs are much less expensive if addressed up front before construction begins.
In short, make sure the design-builder or architect prepares detailed drawings and specifications. Also ask for each of the material samples, cut sheets, or possibly mock-ups of the assemblies. This will assist you in making the best choices, insuring you receive what you expected while significantly reducing the number of change orders from subcontractors who bid something other than what you wanted.
Your architect or design-builder will advise and guide you through the design phase. Most of the time it begins with a 'Programming Session' also known as a 'Design Charrette'. This will be a general discussion on what you would like to accomplish with the new building, the look you are expecting, how many people will it need to accommodate, what your budget is, etc. To help prepare for this important first step, consider the following questions:
- Are there limitations to the design (size of rooms, exterior finishes, interior finishes, ceiling heights, open spaces without columns, etc) in any way?
- Are there local building restrictions? Deed restrictions? Planning and zoning requirements? Local ordinances addressing trees or landscaping?
- What are the most appropriate materials and finishes for aesthetic purposes or maintenance?
- Are there special needs for data, voice, or controlled security access systems? Do these potential systems affect HVAC design with certain temperature or humidity ranges? Are there any special acoustical (sound deadening) requirements? Will a central building energy management system be utilized? Must there be sustainable features incorporated into the construction, possibly to achieve a LEED certification?
In most cases, whether adding on to an existing building, constructing a permanent stand-alone facility, or providing for an interim use with a relocatable modular building, matching the look of an existing adjacent structure should not be a problem. A qualified design-build firm or architect will have the resources necessary to complement or match the surrounding architecture and landscape as well as being able to blend masonry, stucco, metal, or other types of exterior cladding.
While it is often more cost effective for the owner to handle permit applications and site plans on small projects, on mid-size or larger projects it rarely saves the owner money. The design-builder, architect or general contractor is usually more experienced in working with the city planning department on permitting, and with the civil engineering firm on site design issues. The other questions to ask are:
- Who will acquire the state and/or local approvals and building permits? Arrange for inspections? Obtain the 'Certificate of Occupancy' required before moving into the building?
- What work elements might we be comfortable in taking on ourselves? What services or scopes of work do we want to contract out and from whom?
The design-build firm will provide a full-time project manager and a full-time site superintendent to manage the entire project. The superintendent is the eyes and ears on the project and supervises all of the local sub-contractors, while the project manager administers the overall project by issuing subcontract agreements, scheduling material deliveries, as well as coordinating the efforts of the design team, permitting process, inspections, and other critical project milestones. If an architect is hired to design the project, the owner can either provide their own construction manager or hire the architect to act as a liaison between the owner and the general contractor.
If you are looking for more details, kindly visit Steel Construction Engineering.
Previous: 7 Essential Tips for Choosing the Perfect Caravan Mobile Home
Next: Revolutionizing Steel Construction Engineering: Innovations and Trends
If you are interested in sending in a Guest Blogger Submission,welcome to write for us!
Comments
0